Critical-load planning

Backup power systems

Build from the load outward: identify critical circuits, starting surge, target runtime, transfer method, charging plan, and expansion path.

Backup power systems
Decision chart Estimated runtime at a 150W critical-load bundle Starting estimate using 80% usable energy. Real runtime changes with surge, cycling, temperature, inverter draw, and battery condition.
300Wh battery 1.6 hr
500Wh battery 2.7 hr
1,000Wh battery 5.3 hr
2,000Wh battery 10.7 hr
3,600Wh battery 19.2 hr
Recommended starting points

Products that fit this category

Use the linked guide and calculator to confirm the fit before buying.

Two-minute sizing start

What are you trying to keep running?

Pick the load and target time. We will estimate the battery class, then send you to the right guide and full runtime calculator.

Scroll to Top
As an Amazon Associate I earn from qualifying purchases. Affiliate disclosure